The work is being carried out under overnight road closures due to the nature of the works, narrow widths of the carriageway and to ensure the safety of roadworkers and the travelling public whilst the works are underway.
Following engagement with key and local stakeholders, the overnight closures of the A77 will take place between 8pm and 6am each night, between Monday 23rd and Saturday 28th September 2024. Traffic management will be removed by 6am on Sunday 29th September.
Traffic will be diverted as follows:
Southbound traffic will exit the A77 at Shallochpark Roundabout onto the A714 and follow to North Barnkirk, turning right onto the unclassified road to South Barnkirk and then turning right onto the A75 and continuing westbound towards Stranraer before taking the A751 to Innermessan and rejoining the A77 northbound towards Cairnryan.
Northbound traffic will take the A77 southbound and turn left onto the A751 then left onto the A75 eastbound towards Newton Stewart, turning left onto the unclassified road at South Barnkirk then left onto the A714 at North Barnkirk and following to the A77 Shallochpark Roundabout. Other local routes are available.
Stena Line